For housebuilders and developers

    Developer Part L package: design stage to handover, one fee per plot

    Sites of two plots upwards where the same team should hold Part L from design through to completion.
    From £120 per plot, guide onlyFixed written quote first
    UK housing development under construction, with brick houses at several stages and scaffolding along a site road
    The short answer

    The developer package covers Part L for a residential site from first drawings to handover: design-stage SAP for each dwelling type, the as-built calculations once construction is finished, and the on-construction EPC for every plot. Air tightness testing and ventilation commissioning are coordinated alongside so the evidence arrives in the order building control expects. Guide fees run from about £120 to £200 per plot depending on the number and variety of dwelling types, confirmed in writing before work starts.

    020 3092 8551
    Awais Sarwar, founder of Part L Consultant

    Who runs your contract

    Awais Sarwar, MScAccredited Energy Assessor

    Awais is an accredited domestic and commercial energy assessor and the owner of Team EPC Ltd, which trades as Part L Consultant. He has surveyed and lodged EPCs across flats, houses, HMOs, managed portfolios and commercial premises throughout London and the Home Counties, and is currently studying an MSc in philosophy alongside running the business.

    EPC Register
    Accredited assessor
    MSc
    Built environment
    MSc Philosophy
    Currently studying
    10+ years
    London property
    Part L focus
    Design to as-built

    Off the clock: cricket, family time, an MSc in philosophy in progress and finding London's best food.

    Awais Sarwar away from work, out in a London park

    Awais Sarwar

    Founder · Accredited energy assessor

    About Awais

    What you get

    Everything this package covers.

    Design-stage SAP for every dwelling type

    Each house type and flat type modelled from your drawings and specification, with the compliance route and the fabric and services assumptions set out in writing before you build.

    Specification support while decisions are open

    Where a type does not pass, we test alternatives — insulation, glazing, heating, ventilation — and tell you which changes move the result and which do not, before the specification is fixed.

    As-built SAP at completion

    The models updated to what was actually built and installed, using your as-built information, air test results and commissioning records.

    On-construction EPC per plot

    The certificate produced from the as-built calculation for each completed dwelling, ready for sale or letting.

    Air tightness and ventilation coordination

    Testing and commissioning scheduled with your programme, and the results fed straight into the calculations rather than chased after the fact.

    One contact and one invoice

    One person holds the whole site, tracks which plots are outstanding, and issues a single consolidated invoice rather than a fee per certificate.

    When it applies

    Projects this package is built for.

    • New dwellings on a site of any size, whether houses, flats or a mix
    • Schemes still at planning or technical design where the specification can still change
    • Sites already under construction that need as-built calculations and EPCs closed out
    • Projects deciding between the Part L 2021 and 2026 standards under the transitional dates

    Not included

    What sits outside the fee.

    • Building control application fees and any local authority charges
    • Structural, drainage, acoustic, overheating or daylight assessments
    • Air tightness testing carried out by the tester — coordinated by us, invoiced by them unless quoted separately
    • Site supervision or inspection of workmanship

    Guide fee

    From £120 per plot, guide only

    Guide bands only, excluding VAT. Once we have the drawings and the schedule you receive a fixed written fee before any work begins. Nothing on this site produces a compliance result.

    See all guide fee bands for individual services.

    Process

    How the instruction runs.

    1. Step 1

      Send the drawings

      Floor plans, elevations, sections, the outline specification and the plot schedule.

      Day one

    2. Step 2

      Fixed quote

      A written fee per plot and a programme, with the information we still need listed.

      Usually same day

    3. Step 3

      Design-stage calculations

      Each type modelled, with a written compliance route and any specification changes needed.

      3–5 working days

    4. Step 4

      Build

      We stay available for substitutions and changes on site, and re-run the model where a change matters.

    5. Step 5

      As-built and EPCs

      Calculations updated to what was built, then the on-construction EPC issued per plot.

      2–4 working days after evidence

    Reviewed by Awais Sarwar, MSc, accredited energy assessor and owner of Team EPC LtdLast reviewed

    Send the project and get a fixed fee.

    Drawings, the schedule and your building control position are enough to quote. You get the fee, the programme and a list of anything still needed.
    020 3092 8551

    Guide bands only. Fixed quote in writing before work starts.

    Frequently asked questions

    Last word

    Ready when you are.

    Send the drawings, get a fixed written quote, and have the design-stage calculation before work starts on site. That's the whole process.

    020 3092 8551
    Transparent pricing No obligation SAP, SBEM and EPCs England and Wales
    Awais Sarwar
    — Awais Sarwar, MSc
    MD · Accredited energy assessor
    SAP & SBEM calculations·
    Fixed written quotes
    Call