    Part L for extensions: the glazing allowance and how compliance works

    Why a glazed rear extension often needs a calculation, how the 25% allowance is worked out, and what your options are when the design goes past it.

    8 min readBy Nabhan Islam Reviewed by Awais Sarwar, MSc Updated 15 Sept 2026
    Part L for extensions: the glazing allowance and how compliance works
    The short answer

    For an extension to a dwelling, Part L allows glazing up to 25% of the extension's floor area, plus the area of any windows or doors that are no longer in place because of the work. If the design exceeds that, the extension must be shown to perform no worse than a compliant one, which is normally done through a SAP comparison. That is why heavily glazed rear extensions with sliding doors and roof lights so often need a calculation, even though the rest of the work is straightforward.

    020 3092 8551

    Glazing allowance

    25% of the extension floor area

    Plus

    Area of windows and doors no longer in place

    Above the allowance

    Show it performs no worse than a compliant extension

    Usual method

    SAP comparison

    Awais Sarwar, founder of Part L Consultant

    Who runs your contract

    Awais Sarwar, MScAccredited Energy Assessor

    Awais is an accredited domestic and commercial energy assessor and the owner of Team EPC Ltd, which trades as Part L Consultant. He has surveyed and lodged EPCs across flats, houses, HMOs, managed portfolios and commercial premises throughout London and the Home Counties, and is currently studying an MSc in philosophy alongside running the business.

    EPC Register
    Accredited assessor
    MSc
    Built environment
    MSc Philosophy
    Currently studying
    10+ years
    London property
    Part L focus
    Design to as-built

    Off the clock: cricket, family time, an MSc in philosophy in progress and finding London's best food.

    Awais Sarwar away from work, out in a London park

    Awais Sarwar

    Founder · Accredited energy assessor

    About Awais

    How the allowance is worked out

    Take the internal floor area of the new extension and multiply it by 25%. Then add the area of any windows and doors that are no longer in place as a result of the work — the patio door in the wall you are removing, for instance. The total is the glazing area the guidance allows without further justification. Note that this is an area test, not an aesthetic one: two designs with identical glass area are treated the same whether the glazing is a wall of sliders or a run of modest windows.

    ItemArea
    Extension internal floor area30 m²
    25% allowance7.5 m²
    Existing patio door removed4.2 m²
    Total glazing allowance11.7 m²
    Proposed sliders and roof light16.0 m²
    PositionAbove the allowance — a SAP comparison is the normal route
    Worked example of the 25% allowance

    Shared company experience

    Real buildings.
    Relevant experience.

    Selected work delivered by our sister companies, Team EPC and Fire Risk Specialists. Every card names the business responsible; these are not presented as Part L commissions.

    Exterior of Pinnacle Tower in Wembley, London
    Team EPC

    Wembley, London

    Pinnacle Tower

    Delivered by Team EPCBulk domestic EPC programme

    A tower-wide programme, coordinated as one instruction.

    Exterior of City Deal Estates in Central London
    Team EPC

    Central London

    City Deal Estates

    Delivered by Team EPCManaged portfolio energy assessments

    Period properties reviewed building by building.

    Exterior of 1 Harrington Gardens in South Kensington, London
    Fire Risk Specialists

    South Kensington, London

    1 Harrington Gardens

    Delivered by Fire Risk SpecialistsLuxury serviced apartments

    48 apartments. One coordinated fire risk assessment.

    Exterior of Bang Bang Oriental in Colindale, North London
    Fire Risk Specialists

    Colindale, North London

    Bang Bang Oriental

    Delivered by Fire Risk Specialists32,000 sq ft food hall

    25+ kiosks. High footfall. One rigorous assessment.

    What happens when you go over

    Exceeding the allowance is not a refusal. Approved Document L's own answer is that the extension must be shown to perform no worse than a compliant one, and in practice that means modelling two versions of your extension: yours, and a notional version built to the guidance with the allowance respected. If yours performs at least as well, you have your demonstration. This is the calculation that most glazed rear extensions actually need, and it is usually the cheapest way to keep the design intact.

    The levers that make a glazed design pass

    Glass is a heat-loss element, so the model has to recover the loss somewhere. There are more levers than people expect, and they do not all cost money.

    • Better glazing — lower U-value units, and g-values chosen for orientation
    • Improved wall, roof and floor U-values in the extension
    • Reduced thermal bridging through better junction details
    • A more efficient heat source or improved controls serving the extension
    • Upgrading an element of the existing dwelling as part of the works
    • Reducing roof light area, which often loses more than an equivalent area of vertical glazing

    Conversions and changes of use

    A loft conversion, garage conversion or change of use is a different exercise from an extension, because you are working with existing fabric and the guidance treats the newly conditioned space on its own terms. These jobs turn on what is genuinely achievable in the existing construction, so we quote them on the drawings rather than from a price list — a garage conversion with a solid floor and a loft with a room-in-roof structure are not the same job.

    What we need to quote and to model

    For an extension we need the proposed plans and elevations, a note of the construction build-ups, the glazing schedule with sizes, and what is happening to the existing openings. If you also tell us what heating serves the extension we can usually confirm at quotation stage whether the design is comfortably inside the allowance or whether a comparison is the route — which means you know the fee before you commit.

    Written by

    Nabhan Islam

    Head of Marketing & Commercial Lead

    Reviewed by

    Awais Sarwar, MSc

    Accredited Energy Assessor — Accredited domestic and commercial energy assessor, listed on the EPC Register

    8 min readLast reviewed 15 September 2026Facts verified 15 September 2026 Checked quarterly

    Sources

    1. Approved Document L: conservation of fuel and power GOV.UK
    2. The Building Regulations 2010 legislation.gov.uk
    3. Building control approval: how to apply GOV.UK

    Was this page helpful?

    Call

    Frequently asked questions

    Last word

    Ready when you are.

    Send the drawings, get a fixed written quote, and have the design-stage calculation before work starts on site. That's the whole process.

    020 3092 8551
    Transparent pricing No obligation SAP, SBEM and EPCs England and Wales
    Awais Sarwar
    — Awais Sarwar, MSc
    MD · Accredited energy assessor
    SAP & SBEM calculations·
    Fixed written quotes
    Call