    Part L 2026 transition checker

    Enter your building control application date and your start on site, and see whether that building keeps transitional protection under the published 2026 dates.
    Awais Sarwar, founder of Part L Consultant

    Who runs your contract

    Awais Sarwar, MScAccredited Energy Assessor

    Awais is an accredited domestic and commercial energy assessor and the owner of Team EPC Ltd, which trades as Part L Consultant. He has surveyed and lodged EPCs across flats, houses, HMOs, managed portfolios and commercial premises throughout London and the Home Counties, and is currently studying an MSc in philosophy alongside running the business.

    EPC Register
    Accredited assessor
    MSc
    Built environment
    MSc Philosophy
    Currently studying
    10+ years
    London property
    Part L focus
    Design to as-built

    Off the clock: cricket, family time, an MSc in philosophy in progress and finding London's best food.

    Awais Sarwar away from work, out in a London park

    Awais Sarwar

    Founder · Accredited energy assessor

    About Awais
    Your dates
    Enter the application date to see which standard the building falls under. Everything here follows the published commencement and transitional dates — nothing is estimated.

    The rule this uses

    Part L 2021 can still be used where a building notice, initial notice or full plans application was given before 24 March 2027 and work on that building starts before 24 March 2028

    It applies building by building, not scheme by scheme.

    Guidance only. Your building control body decides whether a particular building keeps transitional protection, and we will confirm the position in writing before any calculation is run.

    Background

    Why the dates matter more than the design

    Two identical houses can be held to different standards purely because of when they were notified to building control and when they came out of the ground. That is what the transitional arrangement does: it protects buildings already in the system, not schemes or companies.

    The practical risk on a phased site is drift. A plot programmed to start in early 2028 that slips a few months moves from Part L 2021 to Part L 2026, and the change is not cosmetic — the 2026 standard brings a new requirement for on-site renewable electricity generation for new dwellings, so a design without panels may no longer stand up.

    If any of your plots sit near the line, model both cases at design stage. Knowing what the 2026 version of the house needs is far cheaper than finding out after the foundations are in.

    Transition checker — questions we get asked

    Last word

    Ready when you are.

    Send the drawings, get a fixed written quote, and have the design-stage calculation before work starts on site. That's the whole process.

    020 3092 8551
    Transparent pricing No obligation SAP, SBEM and EPCs England and Wales
    Awais Sarwar
    — Awais Sarwar, MSc
    MD · Accredited energy assessor
    SAP & SBEM calculations·
    Fixed written quotes
    Call